PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed fleece back at the high roof Facing South.jpg Installing bathroom carriers at the 4th floor bathrooms Facing North.jpg Installing copper piping at the 3rd floor Facing North.jpg Installing handrails at Stair -3 4th Floor Facing North.jpg Installing sprinkler branches and heads at the 4th floor Facing East.jpg Installing sprinkler branches and heads at the 4th floor Facing North.jpg Laying out block at Corridor 149 Facing South-East.jpg Installed fleeceback at the high roof Facing West 1.jpg Installed fleeceback at the high roof Facing West.jpg
Previous pageNext page Installing sprinkler branches and heads at the 4th floor Facing East
Installing sprinkler branches and heads at the 4th floor Facing East